On the 1st of July, 2011, the Assembly and Works division of Nexxo SA, was awarded the perimeter fence contract by Codelco Ventanas.
The project involves the building of 18.5 meter high mesh fences, which are designed to eliminate the exterior pollution problem. The job will last six months, with a workforce of 80 people.
This project is in the planning stage of costs and assembly logistics and were sure our staff will overcome this challenge with typical Nexxo professionalism.

Main Office : Parque Industrial Gulmué / Lote 3A / Camino Internacional Concón s/n / Tel.: 56 (32) 2133200 / Fax : 56 (32) 2133222 / V Región - CHILE